Read as much as you want on BostonGlobe.com, anywhere and anytime, for just 99¢.

Refurbishing the Longfellow Bridge towers

1. A barge-mounted crane on the Charles River is moved into position at the Cambridge tower.

2. The granite blocks will be removed, loaded on a barge, and taken away for cleaning, storage, and repair.

3. After the Cambridge tower is removed, the tower on the Boston side will be removed.

4. The towers will be dismantled to the level of the sidewalk. The granite blocks below the level of the deck will be refurbished in their place.

You have reached the limit of 10 free articles in a month

Stay informed with unlimited access to Boston’s trusted news source.

  • High-quality journalism from the region’s largest newsroom
  • Convenient access across all of your devices
  • Today’s Headlines daily newsletter
  • Subscriber-only access to exclusive offers, events, contests, eBooks, and more
  • Less than 25¢ a week