March 3 1961: This photo shows workmen as they exposed the pilot, 6 x 8 feet tunnel coming from Boston and the main tunnel coming from East Boston. The two tunnels met under North St. in Boston's North End. There was less than a half-inch variance from the plans on either side of the two tunnels. The foreman overseeing the breakthrough, on the right, was Ken Smith from Brighton.