July 7 1946 / fromthearchive / Boston Globe Archive photo / The making of runway A and runway B involved trucking in about 1,100,000 cubic yards of yellowish gray gravel for fill for the new 7000 foot runways. Nearly 300 trucks a day piled high with the gravel made the trip from gravel pits in Middleton and Peabody.